ASV RC100/ RT100/ R100 Rubber Track

FOB Reference Price:Get Latest Price
$712.00 - $1,068.00 / Piece | 2 Piece/Pieces (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Jiangxi, China
Brand Name:
AOYU
Model Number:
457*101.6*56 rubber track, 18"*4"*56 Rubber Crawler Track
Name:
267, 277 Loader Rubber Track
Machine:
267B Loader Rubber Track
Material:
Natural rubber / Synthetic rubber
Skeleton Materials:
Rubber Lug/Kevlar/Nylon Cord/Steel Wire
Weight:
146 kgs
Color:
Black
Loader Operating Weight:
3600 kgs
Supply Ability
Supply Ability:
1200 Piece/Pieces per Year
Packaging & Delivery
Packaging Details
Polyester Bags Packing; Steel Pallet Packing; Wrapped In Circle or Upon Customers' Requirement
Port
Shanghai or Ningbo or Qingdao
Product Description

ASV Rubber Track for Terex RC100, 267 Loader Rubber Track Pictures

 457 6.jpg457 3.jpg457 17ok1.jpg457 4ok.jpg457 457 1.jpg

 

 

.jpg

 

ASV RC100 Loader, Terex RC100 Loader, 267 Loader Rubber Track Features:

 

- Vehicle Model: ASV RC100 Loader, Terex RC100 Loader 

- Tread Pattern: BA

- Inside Kevlar Diameter: 1.5mm

-Inside Steel Wire Diameter: 2.3mm

- Height of Steel Wire: 10mm

- Deep Treadbars for Superior Performance & Traction in Snow, Sand, Mud and Soft

  Terrains

- 100% Installation and Fit for Original ASV Loader Vehicle

 

Machine Picture: Terex RC100 Loader, ASV RC100 Loader

 

 

CroppedImage516384-Terex-PT100G.jpg

 

Size:                                         18'' (width) * 4" (pitch) * 56 links

Net Weight:                             146 kgs

Name:                                       No Metal Core ASV RC100 Rubber Track

Package Dimension(2 PCS):  1500mm(length)*460mm(width)*850mm(height)

Package Volume:                    0.58 cubic meters

 

Packaging & Shipping

 Rubber Track for 277, 267B,277B,267 Loader

 

Steel Pallet Packing or Wrapped in Circle or as Customers' Requirement

 

 Advanges: 1  Packaging is strong enough to withstand rough handling;

                     2  It's suitable for long distance ocean transportation.

     .jpg  HTB1ciXCHVXXXXXJXVXXq6xXFXXXQ

Warranty

 

In general, our warranty time is 6 months or 500 working hours.

 

When incorrectly using our products to make the rubber track damage, we will not compensate our customers' losses.

 

But if the damage is caused because of our production problem, we will 

compensate the relevant losses as follows:

 

1 If use the products not more than 3 months, we will compensate all the losses    of clients when the quality problem happens;

 

2 If use the products for 3-5 months, we will compensate 50% ofthe losses

   when the quality problem happens;

 

3 If use the products for 5-6 months, we will compensate 25% of the losses

   when the quality problem happens.

 

Our Services

 

1  High Efficency, Fast Speed, Top Service

2  Provide OEM Service

3  When due to our producing problem, we will compensate the customers for

    their loss

4  We have a professional after-sales service team for our customers

5  Fast handling and delivery

6  Available at any time

 

Technology

 

1 Circular winding and jointless structure of the steel wire enables the tensile  

   stress's balance.

2 Mixture use kevlar fiber and steel wire to lower the kevlar's high elongation

   and make sure the overall tensile strength of the rubber track. 

 

.jpg

Advantages

 

 1  We have rich manufacturing experience for 7 years to make sure the

     product's quality.

 

2   Unique rubber formula

 

3   We have the top technical experts in the domestic track industry and they

     always keep up with the state of the art technology.

 

4   A fair claim settlement 

Company Information

Aoyu Rubber Track Co., Ltd.

1

Workshop & Equipment

Professional Equipment

Certificate


FAQ

1. What are the basic materials do you use?

    Natural rubber and synthetic rubber.

2. What type of product that you can do?

    Special Rubber Track, Agricultural Machinery Rubber

    Track, Constructional Machinery Rubber Track and

    Rubber Pad.

3. Whats your delivery time?

    Within 15 days.

4. What are your main terms of payment?

    T/T, L/C.

5. What kind of package do you use?

    Polybags, steel pallet or as you required.

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like